On-Site Requirements for Distribution Box Installation
Apr 12, 2026
Leave a message
In accordance with the power distribution system, the installation of distribution boxes must be organized hierarchically-specifically in the sequence of main distribution boxes, secondary distribution boxes, and switch boxes-thereby establishing a three-tier distribution model. Construction work must adhere strictly to the engineering drawings. Furthermore, the on-site placement of distribution boxes and switch boxes must be rationally allocated: the main distribution box should be situated in close proximity to the transformer or external power source to facilitate power input, while secondary distribution boxes should be installed near power-consuming equipment or areas with concentrated loads to ensure the balance of three-phase loads. Switch boxes should be positioned as close as possible to the actual points of power consumption, based on the specific conditions of the construction site.
Regarding power supply for both motive power and lighting at the construction site, two distinct electrical circuits must be established; consequently, separate distribution boxes must be designated for motive power and for lighting.
Each distribution box must be equipped with a main disconnector, branch circuit disconnectors, a main fuse, and branch circuit fuses; the rated capacities of the main switching devices and the branch switching devices must be appropriately matched.
Residual Current Devices (RCDs) that comply with design standards must be installed within the distribution boxes, typically situated on the load side of the main power disconnector. Distribution boxes and switch boxes must be kept free of miscellaneous debris and maintained in a clean condition; the connection of any unauthorized or temporary electrical equipment is strictly prohibited. If work operations cease for a period exceeding one hour, the construction distribution boxes must be securely locked for protection.
Send Inquiry